Showing posts with label UFOs. Show all posts
Showing posts with label UFOs. Show all posts

Monday, January 28, 2013

GOALS FOR 2013

Before I bore you with my goals/UFOs, I'll show you what I worked on over the weekend.

I finished the six baskets that I prepped 3 different ways.  The ones I prepped in #1, which was using the magic sizing to stick the seam allowance onto the back, worked the best and was the easiest applique to accomplish.  I prepped 3 more like that to do this week.  All the baskets came out ok, but I wasn't satisfied with methods #2 & #3.


Here's a picture of all the baskets I've finished so far (on my design door).

I also decided to do the QAL that Lori posted on her blog.  It's a small one this year.  I can't believe all the problems I had while putting it together.  First, the needle broke and when I put in the new needle, I couldn't get my automatic needle threader to work.  Then I lost one of the large triangles for the flying geese on the middle star and had to cut another one (found 1st one under a cabinet).  While cutting some fabric for the second round, I cut off the corner of the sawtooth star and had to replace the corner square.  When I made the brown/pink flying geese, I cut the brown square the wrong size, made the 4 FG and thought - they sure look different than normal - had to do those over again.  Then I misplaced one of the cheddar pieces and had to hunt for it - it was folded in a piece of pink fabric!   don't know what my problem was, but I finally got the top finished!!  Yea!


I cut a bunch of 1" strips to use in my log cabin blocks from the scrap bag I got.  There's still a lot of fabric left from the bag.


So far I have 196 block finished.  I'm not sure how big I will make it, but I figured if I had 225 blocks, it would measure about 71" square.  I'm going to want it to fit on a bed.

I have quite a few UFO's which I will list and will put an asterisk next to the ones that are a priority.  I have 3 categories of projects:  hand work, which includes embroidery, appliqué, quilting and sewing bindings; quilts; and Miscellaneous projects, such as finishing an embroidery project into a pillow or wall hanging.

Handwork

1.  Over the River and Through the Woods wall hanging - 2 panels of embroidery are finished, one more to do, then it goes into the quilt category.

2. * Baskets for You BOM - applique 12 baskets per month for 10-12 (?) months and then a large floral design in the middle.  I don't want to get behind on the baskets, so will try to do them as soon as I get them from the quilt shop.

3.  Finish flower basket appliqué project that I won from Lori, then decide if I want to make more & how to use in quilt.  Almost finished with one.

4.  Enlarge my GMF lap quilt by about 4 rows all the way around.

Quilts

1.  *Civil War Quilt - the blocks are ready to put together.  It's ready to baste.
2.  **Quilt for DIL - machine appliqué  - Need to finish by March birthday.
3.  **2 secret quilts - Need to finish by September - I'm almost to the point of putting the blocks together.  *As of 5/7/13, the blocks are put together and I'm starting to put the borders together.    As of 9/9/13, one quilt is finished and the other is ready to baste and quilt.
4.  Red Hexie mini quilt - almost finished and ready to be layered - idea from JoAnn - Thread Head.
5.  A Tisket A Tasket applique basket quilt - 8 baskets are done, need to do 4 more and then make into a quilt.
6.  Veranda Views - all embroidery is finished - need to make into blocks and put together.
7.  Oak Leaves & Turkey Feathers wall hanging - started, but not much done - machine applique and piecing.
8.  Scrappity Do Dah - blocks finished - need to put together into queen size quilt.
9.  Grandmother's flower garden lap quilt - need to decide if I want to make it bigger and then finish.
*  I decided to make it bigger, so I'm working on more hexies by hand.
10.  Log Cabin Quilt - I've been working on this mainly on trips and have 196 blocks made finishing at 4 3/4".  No hurry on this one.
11.  Seasons in a Row - my oldest UFO that was a guild project.  I have about 8 rows finished  and there's one for each month.  *As of 5/7/13, the top is finished.
12.  Basket wall hanging - need to fix it a little, then it's ready to layer and quilt.
13.  Ohio Star boys donation quilt - have about 12 blocks made.
14.  4-patch donation quilt - have lots of blocks made - it's a leader/ender project.

Miscellaneous

1.  Finish embroidery on Denim shirt.
2.  Finish round wool pincushion.
3.  Finish bird pincushion.
4.  Put together Liberty Bell embroidery project - stitching is finished.  I decided I didn't like the fabric that the Liberty Bell was embroidered on, so I need to make a new one.
5.  Put together sampler cross-stitch project - stitching is finished.

If I can resist starting any more projects, I should be able to complete some of my UFOs.  I plan to dedicate myself to getting projects finished.  I also want to organize my sewing closet and scraps so I can use them more efficiently.  I'm not sure when I'll get to those tasks.

Wish me luck!