Friday, October 31, 2008

BABY QUILT FINISHED & SENT

I finished the baby quilt and mailed it yesterday!  We decided we would not make the trip to Florida for the baby shower because of DH's bulging disc.  The 11 hour drive would be pressing our luck too far.  

I decided to do a meandering quilting on it and I'm pretty happy with the way it turned out.  It's not a perfect job, but it's he best I can do right now.  I have a Patsy Thompson quilting DVD which I want to view some more & do the practice mini quilts - if I can find it (I "put it away" when cleaning up for company and now can't find it)!






On to the next project!

Saturday, October 25, 2008

WORKS IN PROGRESS

It's been a while since I blogged.  I was planning to go on a little trip with my sister & cousin, but my DH had a bad spell again.  To make a long story short, we found out that he has a bulging disc and he was in the hospital for a week.  He will be getting a shot in the disc on Monday that we're hoping will help the pain situation.  So, I had to cancel another trip.

Of course, I have kept working on various projects and right now I'm quilting the baby quilt for the new GD expected in December.  I hope to finish the quilting today and then will sew on the binding.
A friend at work has asked me to make a doll quilt for her GD, so here is a picture of what I have started.  The backing is on top of the quilt top.  The second picture below shows 2 doll quilt tops together.  

While DH was in the hospital, my DS#3, DIL & GS came to visit.  I asked my DIL if anyone was planning to make Jonah a Christmas stocking (kind of hoping his other GM was planning to do it), but no, noone else was going to do it, so we found a cross stitch pattern and I  have started working on it.  I like to have handwork handy that I can take with me to places like - umm - hospitals, doctor's appointments, etc.  Hope I finish it in time for Christmas, but actually, at his age (5 months), he won't know the difference.
This morning I went for a walk in my neighborhood.  It was 46 degrees and felt sooo good!  I came across a garage sale and bought a few items of lace, etc.  (below).  I will probably use them for some craft projects, like Christmas ornaments or doll bed linens.  Besides the doll quilts I'm making now, I am planning to make doll bed linens for the new GD, however, won't need them for a couple years, since she's not even born yet!
Have a great weekend, everyone!

Thursday, October 9, 2008

DOUBLE NINE PATCH

The Nine Patch is a great, easy block and the Double Nine Patch is even better!  I decided to make a quilt for DS#3 and DIL because when they got married, I only made them a small 60" square throw because I was relatively new at quilting.  Since then I have made both DS#1 & DS#2 large bed quilts, so I thought I better get one made for DS#3.  My DIL loves reproductions, so I picked them mostly.  I need 80 of the small 9-patches and I have most of them finished.  They are coming tomorrow, so I wanted to be able to show my DIL that I have been working on it!  :-)

Here are 3 of the double nine patches put together.
Here's my sewing machine where I am chain stitching.
I just finished a quilt for my GS who is turning 13 in November.  He wanted a new quilt for his bed (since they moved into a bigger house) and he also loves "old things" so is getting a quilt made with reproduction fabrics with a pillowcase to match the backing and border.

Wednesday, October 1, 2008

More Vintage Doll Clothes

My mom made the doll dress and coat in these pictures probably during the 1950s.  I have them hanging in my front hall.

See the wood spools on the little shelf?  I got them from my mom's sewing box.